TechRadar · 1 min read

US Navy's new "Trump class" nuclear-powered program could hit $275 billion — with the first ship alone costing an eye-watering $23.4 billion

 US Navy's new "Trump class" nuclear-powered program could hit $275 billion — with the first ship alone costing an eye-watering $23.4 billion

US Navy's proposed Trump-class program could cost $275 billion while demanding unprecedented shipyard output despite persistent construction delays and rising costs.

This is a summary aggregated from TechRadar. Read the complete article on the original site:

Read full article at TechRadar

Related stories